13.10.2020
A new block of triangular floor plan with a hotel and business units will be created on the hitherto unused parking area between the railway station, Hybernská Street and the main road.
The building completes the street profile of Hybernská Street and shields it from the noisy traffic on the main road. At the same time, a new residential street will be created between the track and the completed block, also providing access to the National Technical Museum. The hotel has already received a zoning decision and construction is scheduled to begin in 2022.
In the spring of next year, however, a rescue archaeological survey will begin in its place. Below the building there are Gothic walls (Mountain Gate), Baroque walls (bastion) and a relief channel of the fortification (from 1860). Part of the Baroque walls will remain visible through the window in the facade of the hotel.
The new building will have 7 floors. The top floor will be recessed with a terrace, similar to the roofs of neighboring houses. In the basement is planned one floor with garages and technical facilities.
The hotel should be approved and opened in mid-2024.